|
Title:
|
Setting a public hearing: proposed construction of a pre-engineered metal building (PEMB) at the Material Recovery Facility site located on the south side of Peabody Road; providing for construction of the proposed improvement using a design/build contract.
|
|
Indexes:
|
Design/Build Contract, Setting a Public Hearing, Solid Waste
|