|
Title:
|
Proposed construction of a pre-engineered metal building (PEMB) at the Material Recovery Facility site located on the south side of Peabody Road; providing for construction of the proposed improvement using a design/build contract.
|
|
Indexes:
|
CIP- Capital Improvement Projects, Design/Build Contract, Public Hearing, Solid Waste
|