Title
Proposed extension of two 13.8 kilovolt electrical feeder circuits from the Rebel Hill Substation to the proposed ten (10) mega watt Truman Solar Facility located east of Burnside Drive.
Body
(Tabled at the December 17, 2018 Council Meeting.)
Recommended Action
[Need Motion/Mayor Memo]