physical fitness center. So the location map, we've gone over that just east of Scott and
Vawter School Road. So the existing CP plan from 2005, like I mentioned, showed a
bank and it had a drive-through in a similar configuration to what we have. Their building
was basically rotated 90 degrees, but the drive-through was always on the north side, so
we felt that that was important to honor that, keep it away from the residential portion.
So the old plan had zoning approved with the old C-1 uses. A few of those include
restaurant, barber, beauty shop, pet stores, animal grooming, physical fitness centers,
and various retail. So this is what the old PD -- excuse me -- CP plan looked like, and it
showed approximately, I think it's 3,200 square feet of building rotated 90 degrees, like I
mentioned, with three lanes of bank drive-through on the north side. So our proposed
plan includes the restaurant with the drive-through and patio seating, like I mentioned, an
office space, retail personal services, and we followed those same uses that are allowed
in the current zoning of that property. And we're also honoring the existing 50-foot platted
landscape buffer, so on the plat of that property, there is actually the 50-foot landscape
buffer indicated on that plat. So here's what our PD plan looks like. As we mentioned,
we kind of already gone over the layout a little bit. Storm water was brought up. I think
Brad answered a couple of questions, fielded a couple of questions from the neighbors to
the east in the residential property, so the original plan didn't have any storm-water
requirements, as they weren't required back in 2005, so this plan is actually increasing
the square footage from that old plan approximately 3,300 square feet. So for mitigation
of that increase in impervious surface, we're proposing -- we've got a couple of options for
either underground storm-water mitigation, or above-ground shown there in those two blue
options. In conclusion, a major amendment to an existing plan, the uses are allowed by
right in the previous zoning of following kind of the C-1 zoning that's located along a major
arterial, already existing commercial developments to the north and the west. It's pretty
well screened and buffered from the properties to the east, and we are providing
storm-water mitigation as required by City Code. And I'm happy to answer any
questions.
MS. GEUEA JONES: Are there any questions? Commissioner MacMann?
MR. MACMANN: Thank you, Madam Chair. Mr. Greene -- Planner Kelley, can we
go back to the aerial, please?
MR. KELLEY: This is the most recent one. This one doesn't show the rest of the
development on site.
MR. MACMANN: The one that was closer up.
MR. KELLEY: Of the PD plan?
MR. MACMANN: This is fine. I will make this work.
MR. KELLEY: Okay. Sorry.
MR. MACMANN: Mr. Green, maybe you can help me here. I know that to the west