Columbia MO Return to CoMo.gov
File #: PH24-22    Version: 1
Type: Public Hearing Item Status: Approved
File created: 5/18/2022 Meeting Body: City Council
On agenda: 7/5/2022 Final action: 7/5/2022
Enactment date: Enactment #:
Title: Proposed construction of traffic calming devices on Smith Drive between Scott Boulevard and Louisville Drive, on Louisville Drive between Chapel Hill Road and the geographic boundary of the Columbia city limits, and on Louisville Drive between Smith Drive and the geographic boundary of the Columbia city limits.
Indexes: Public Hearing, Traffic Calming
Attachments: 1. Council Memo, 2. Location Map, 3. Preliminary Plan-Smith Drive - Louisville Drive Traffic Calming, 4. Speed Study - Smith Drive, 5. Speed Study - Louisville Drive, 6. IP 1 Public Comments, 7. IP 2 Public Comments, 8. IP 2 Sign-In, 9. IP 3 Public Comments, 10. IP 3 Sign-In
Related files: R13-19, R29-20, R29-21, R24-22, R54-22, R82-22
Department: Public Works

Title

Proposed construction of traffic calming devices on Smith Drive between Scott Boulevard and Louisville Drive, on Louisville Drive between Chapel Hill Road and the geographic boundary of the Columbia city limits, and on Louisville Drive between Smith Drive and the geographic boundary of the Columbia city limits.

Recommended Action

[Need Motion/Mayor Memo]